Shadow :: 2007 Infiniti 2007

I had some help from my friend with the first wheel, it took about 3 hours: from removing the wheel from the car, to cleaning it, to wrapping and removing the excess material.
You will need a lot of patience. Its highly recommended that you use a hairdryer to perfect the edges and curves on the rim.
All in all it takes 12 hours, I don't recommend doing all the wheels in one day. Good luck
 
What does it take as far as materials??

---------- Post added at 06:52 PM ---------- Previous post was at 06:50 PM ----------

I liked this and this is why I joined this forum! Ok how do we do it. How much does a set of used 20 inchers cost?
 
Back
Top